![]() |
|
|||
![]() |
![]() |
|||
![]() |
||||
|
||||
![]() |
Wastewater Treatment Plant, Harrington, Washington |
![]() |
Cochran Basin, Inflow and Infiltration Study, City of Spokane, Washington In conjunction with Earth Tech, Inc. and the City of Spokane, USKH designed and supervised installation and maintenance of a system for detecting inflow and infiltration (I/I) into the 10,000 acre Cochran sanitary sewer basin, that covers the majority of the northern half of Spokane. read more... |
![]() |
Water System, Juliaetta, Idaho USKH provided design and construction administration for this $1,500,000 project, that included two tandem 158,000-gallon cast-in-place concrete tanks; replacing most of the existing substandard water main distribution system (more than 15,000 linear feet of new main); and, installation of new hydrants to improve fire protection. read more... |